Every year around this time, we start hearing the same question:

"If I order my cabinets in September, can I still have my kitchen ready for the holidays?"

Maybe. But if you're asking us? We'd tell you August every single time.

Here's why.

Most people look at cabinet lead times and do some quick math.

"My cabinets take four weeks, so I'll be done in a month."

If only it worked that way.

The truth is, cabinet production is only one piece of the puzzle. A kitchen remodel is like a line of dominoes. If one piece gets delayed, everything behind it moves too.

Kitchen Renovation Process from Planning to InstallationKitchen Renovation Process from Planning to Installation

Our current cabinet production times look something like this:

Collection 

Production Time 

Mercury 

2-4 weeks 

Cliq Select 

3-6 weeks 

Signature Plus 

5-7 weeks 

Craftsman 

7-9 weeks 

 

Those timelines begin after you've finalized your design and check out. They also only cover production and delivery.

What they don't include is...well...everything else.

Design revisions. Demo. Electrical. Plumbing. Flooring. Cabinet installation. Countertop templating. Countertop fabrication. Appliance installation. Backsplash. Finish work.

And yes, all of those things matter.

Think about it this way.

If your flooring isn't ready, your cabinet installer probably isn't installing cabinets. If the cabinets aren't installed, your countertop company can't come out to create the template. No template means no countertops. No countertops means the plumber and appliance installers are waiting too.

One delay has a funny way of inviting all of its friends.

Home Renovation Project Managed by Construction Supervisor in Rainy ConditionsHome Renovation Project Managed by Construction Supervisor in Rainy Conditions

Ideally, many of these trades overlap to keep your project moving. Great contractors know how to keep the schedule flowing. But remodeling is rarely perfect. Materials run late. Weather happens. Contractors get booked. A countertop slab might need to be reordered. Something might arrive damaged in shipping.

It happens.

That's exactly why we recommend ordering in August instead of waiting until September.

August gives you breathing room.

It gives your contractor flexibility if another project runs long. It gives manufacturers time if replacement parts are needed. It gives shipping companies a cushion if freight gets delayed. Most importantly, it gives you time to solve problems before they become holiday problems.

Because let's be honest.

The holidays are stressful enough.

You'll already be shopping, decorating, meal planning, cleaning the house, coordinating family schedules, and figuring out where everyone is going to sleep.

Nobody wants to be wondering whether their backsplash installer is going to show up two days before Thanksgiving.

After 22 years designing kitchens, one of our designers, Lindsey, recommends planning your project something like this.

July–August

Finalize your design, confirm your layout, and place your cabinet order.

And here's one piece of advice: don't rush through the final review. We know it's tempting to click through the last few screens because you're excited to get your order moving, but those final checks are there for a reason. Taking a few extra minutes to verify measurements, finishes, hardware selections, and delivery information can save weeks later.

Kitchen Remodel Planning with Cabinet and Countertop Material SelectionKitchen Remodel Planning with Cabinet and Countertop Material Selection

August–September

Your cabinets are being built while rough plumbing, electrical work, and flooring get underway. This is where the foundation of your project comes together. We encourage demo AFTER cabinets are delivered and checked for issues!

September–October

Cabinets are installed, countertops are templated and fabricated, and your kitchen finally starts looking like the one you've been imagining.

October

Countertops go in, followed by plumbing fixtures, appliances, backsplash, trim work, and all the finishing details that make the space feel complete.

Modern Kitchen Remodel with Shaker Cabinets and Large Center IslandModern Kitchen Remodel with Shaker Cabinets and Large Center Island

November

Instead of stressing over contractors, you're hanging decorations, setting the table, and getting ready to host.

Could you start later? Sure.

Will every September project miss the holidays? Of course not.

But if your goal is to stack the odds in your favor, August is the sweet spot.

It gives your project time to breathe, gives your contractors more flexibility, and gives you a buffer when life inevitably throws a curveball.

When it comes to holiday hosting, being ahead of schedule is almost always better than trying to race the calendar.

Your future self, and your holiday guests, will thank you.